Electrical & Arc Flash Audits
Mission-Critical Safety Audits compliant with IS, IEEE, IEC, OSHA & NFPA 70E Standards.
Arc Flash Risk Assessment
Analysis (Phase 1)
- Single Line Diagram (SLD): Grid-to-load flow mapping.
- Short Circuit Analysis: Capability assessments.
- Relay Coordination: Verification of tripping logic.
- Arc Flash Report: PPE category identification.
Implementation (Phase 2)
- Compliant Labeling: Installing boundary markers.
- SOP Development: Defining task-based PPE levels.
- Technical Training: Arc Flash hazard awareness.
- Final Reporting: Full data delivery in PDF formats.
Electrical Safety Gap Assessment
Technical Compliance
- Visible Double Earthing & Pit Resistance Checks
- 30mA ELCB / RCBO / ELR Protection Assessment
- Wire Ferruling, Lugging & Glanding Standards
- Earth Discharge Rods & Rescue Puller Availability
Facility Management
- IS Compliant Panel Rubber Mat Installation
- Smoke Detectors & Panel Room Fire Safety
- Lux Level & Ventilation Optimization
- Visual Signage (Electrical, Fire, CPR, First Aid)
Pre-Audit Requirements
Essential Documents
- Latest Single Line Diagram (SLD) files
- Grid Value data (KVA / MVA)
- Total Load details per equipment
Technical Specs
- KVASc Rating (Short Circuit Capacity)
- X / R Ratio (Reactance/Resistance)
- Site Access for Engineering Tour
Trusted By Leading Manufacturers
Electrical & Arc Flash Audits completed for:
IPCA Labs – Ratlam
IPCA Labs – Dewas
IPCA Labs – Pithampur SEZ
Craftsman Automation – Pithampur
Frequently Asked Questions — Arc Flash & Electrical Safety Audits
Is an arc flash audit mandatory in India?
While India lacks a standalone mandatory standard, facilities above 240V are increasingly required to comply under IS 5216, Factory Act obligations, and international standards like NFPA 70E and IEEE 1584. Insurance underwriters and multinational parent companies routinely require NFPA 70E compliance documentation.
How long does a typical arc flash audit take?
A medium-sized plant with up to 50 panels requires 2–3 days on-site data collection, followed by 5–7 days for analysis and reporting. Larger facilities with multiple substations may take longer. We provide a project schedule during the initial scoping call.
What standards do you follow for arc flash studies?
We conduct studies per IEEE 1584 and align PPE recommendations with NFPA 70E Table 130.5. For Indian facilities, we cross-reference IS 5216 and provide labelling as per Brady ID standards.
What deliverables do we receive after the audit?
You receive: a Single Line Diagram, arc flash incident energy calculations per panel, PPE category labels, arc flash boundary markings, gap assessment against NFPA 70E, and a corrective action plan. Labels are print-ready for Brady ID label printers.
Do you supply arc flash PPE along with the audit?
Yes. As an authorized Honeywell Safety distributor, we supply complete arc flash PPE kits — flash suit, balaclava, face shield, insulated gloves, and voltage-rated tools — matched to the PPE category from your audit.
